Total E&P South Africa

< Go to index

The project consists of several sub-projects considering different set-up and loading conditions which were directed by TEPSA.

Some of the set-up and loading conditions are mentioned below:

  • Riser with Retention System (2 concepts)
  • HP Drilling Riser Concept

The study includes:

  • Connected operability Analysis
  • Disconnected operability Analysis
  • Reconnection Analysis
  • Running BOP Analysis
  • Fatigue Analysis